GeotechnicsEnvironmentMaterial control  
       
 
Geotechnics
Click for more information on the services offered in Geotechnics

Main shaft to a new mine
Geotechnical and structural conception, construction supervision: 2 shafts of which one shown here: Ф = 10 m, 30 m depth, passing through saturated sand deposit, embedded in the bedrock with a collar of 10 m depth.

 
Environment
Click for more information on the services offered in Environment  

Closing of a pond containing tailings generating acid drainage characterization, decontamination, conception of a soil cover against oxygen penetration, a drainage system and a spillway.

 
Material control
Click for more information on the services offered in Material control  

Concrete restoration of a viaduct
Concrete mixture formulas, material control and construction inspection.