|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
 |
Elevator building and treatment
plant of a new mine. Geotechnical study, material control, construction
supervision of the structures installed on piles, compensated and
floating foundations.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- In-situ and laboratory tests for the placing of
concrete, steel, fills, asphalt, roofing materials,membranes.
- Special studies for concrete structures affected
by salt, alkali-silica and shale reactions;
- All laboratory tests on soils (including consolidation),
concrete, granular material;
- Testing on swelling potential of materials containing
pyrite;
|
|
|
|
|
|
 |
|
|
|
|
|
- Traction tests on anchors installed on building
roofs supporting suspended structures. Inspection of welded structures;
- Inspection of materials and the welding during erection
of steel chimneys;
- Detection of steel reinforcement of concrete beams
and columns;
- Structural calculations;
|
|
|
|
|
|
|
|
|
| |

Loading test on pile for under- pinning work. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|